100 GENERAL CONDITIONS
101 Architecture and Design
102 Permits and Fees
104 Testing and Sepcial Inspections
105 Soil Engineering
106 Structural Engineering
107 Survey and Topography
108 Tile 24 Compliance
109 Insurance and Bonds
110 Temporary Fencing and Security
111 Supervision
115 Temporary Sanitation
150 Temporary Utilities
199 Contingency (10% of Hard Costs)
200 SITE WORK
210 Clearing and Grubbing
211 Demolition
221 Site Grading
222 Excavation and Backfill
224 Erosion Control
255 Permanent Utilities
260 Paving
262 Curb and Gutters
263 Walks
271 Fences and Gates
280 Sewer Connections – Septic Tank
300 CONCRETE
310 Formwork
320 Steel Reinforcement
330 Concrete Foundation
331 Concrete Slabs and Patios
335 Concrete Driveways
400 MASONRY
410 Stucco
421 Fireplace Masonry
422 Concrete Blocks
425 Fireplace Facing/Stone Mantel
442 Marble
445 Exterior Stone Veneer
500 METALS
510 Rough Frame Hardware
512 Structural Steel
570 Ornamental Stairs and Rails
600 WOODS AND PLASTICS
610 Rough Carpentry Labor
611 Framing/Sheathing Materials
619 Wood Tusses
620 Finish Carpentry Labor
622 Interior Millwork and Trim
640 Cabinetry
643 Wood Stairs and Railings
700 THERMAL AND MOISTURE PROTECTION
710 Waterproofing
720 Insulation
731 Roof – Composition Shingle
732 Roof – Tile
740 Exterior Siding
750 Roof – Membrane Build-up
760 Flashing and Sheetmetal
780 Skylights
ITEMS DESCRIPTION
800 DOORS, WINDOWS AND GLASS
820 Exterior Doors
821 Interior Doors
830 Sliding Glass Doors
850 Metal Windows
860 Wood Windows
870 Finish Hardware
872 Garage Doors and Operators
883 Mirrors
900 FINISHES
925 Gypsum Drywall
930 Tile Countertop
934 Marble Countertop
938 Formica Countertop
960 Wood Flooring
961 Wood Mantels
965 Linoleum
968 Carpet
970 Tile Floor
990 Exterior Paint
991 Interior Paint
995 Wallpaper
1000 SPECIALTIES
1017 Tub and Shower Enclosures
1030 Prefabricated Fireplace
1040 Signage
1080 Toilet and Bath Accessories
1100 EQUIPMENT
1105 Vacuum System
1140 Kitchen Appliances
1200 FURNISHINGS
1250 Window Coverings
1400 CONVEYING SYSTEMS
1420 Elevators
1500 MECHANICAL
1540 Plumbing – Rough
1545 Plumbing – Finish
1546 Plumbing Fixtures
1550 Fire Protection
1580 Heating and Air Conditioning
1600 ELECTRIC
1610 Rough – Electrical
1614 Finish – Electrical
1650 Lighting Fixtures
1670 Telephone and Prewire
1676 Intercom and Prewire
1678 Television and Prewire
2000 MISCELLANEOUS
Clean-Up
3000 OVER-HEAD AND PROFITS
Over-Head
Profits
SUB-TOTAL
Loan Cost
Insurance, Compansation, P.L. & P.D., Social Security & Unemployment Insurance
Builders Overhead and Profit ________%
TOTAL COST OF CONSTRUCTION
LAND COST

Hakkında Cumhur Şamiloğlu
Civil Eng., MRICS Management of International Business (MSc-2002)

Bir Cevap Yazın

Aşağıya bilgilerinizi girin veya oturum açmak için bir simgeye tıklayın:

WordPress.com Logosu

WordPress.com hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Twitter resmi

Twitter hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Facebook fotoğrafı

Facebook hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Google+ fotoğrafı

Google+ hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Connecting to %s

%d blogcu bunu beğendi: