WBS – Örnek

A. SOFT COSTS:
101 Architect, Engineering
102 Design Review/Plan Check Fees
103 Permits – City/County
104 Impact Fees
105 School/Park/Misc. Taxes
106 Project Bonds
TOTAL PRE-CONSTRUCTION COSTS
B. “SITE”  COSTS:
201 Temporary Utilities & Facilities
202 Special Inspections/Testing-Geo-tech, Structural
203 Job Security
204 Equipment Rental
205 Jobsite overhead
SUB-TOTAL
Site Preparation
301 Demolition
302 Clearing/Stakeout
303 Rough grading/shoring/excavation/fill
304 Site retaining walls/waterproofing/backfill
305 Site drainage
306 Private septic system
307 Domestic Water well
309 Environmental
310 Off-site improvements
SUB-TOTAL SITE PREPARATION
Hard Cost
401 Embedded hardware
402 Ground Plumbing
403 Ground Mechanical
404 Ground Electrical
405 Underground utilities
406 Foundation & Building retaining walls poured
407 Concrete slab poured-house, garage
SUB-TOTAL FOUNDATION COMPLETE
Building Rough-in
501 Structural masonry
502 Rough framing materials
503 Structural steel
504 Modular or Sectional Mfg. Home
505 Lumber Package
506 Mfg. Trusses/components
507 Rough framing labor
508 Lightweight concrete interior floors
509 Plumbing top-out
510 Rough heating, ventilation, air conditioning
511 Rough electrical
512 Fire protection sprinklers
513 Fireplaces incl. Flues
514 Security & Communications pre-wiring
SUB-TOTAL BUILDING ROUGH-IN COMPLETION
Exterior Weather-tight
601 Waterproofing decks, shower pans, etc.
602 Gutters, downspouts, sheetmetal
603 Roof covering
604 Windows
605 Exterior doors
606 Skylights
607 Glazing
608 Exterior siding (See Project Profile)
609 Exterior trim
610 Stucco
611 Masonry veneer
612 Ornamental Iron
613 Garage Doors
614 Exterior painting
SUB-TOTAL EXTERIOR WEATHER-TIGHT
Drywall/Finish Carpentry
701 Insulation
702 Drywall/Plaster
703 Interior stairways
704 Cabinetry
705 Finish Materials/Millwork
706 Interior Doors
707 Finish Hardware
708 Finish Carpentry Labor
SUB-TOTAL DRYWALL/FINISH CARPENTRY
Building Completion/Final Inspection/N.O.C. filed
801 Countertops
802 Tub/shower/enclosures
803 Interior painting/Wall Coverings
804 Hard surface finish flooring
805 Carpeting
806 Built-in Appliances
807 Special Equipment (see property profile)
808 Security system
809 Intercom
810 Built-in Vacuum Cleaner
811 Finish Plumbing
812 Plumbing Fixtures
813 Finish Electrical
814 Lighting Fixtures
815 Finish Heating, Ventilating, Air Cond.
816 Solar Backup
817 Bath Accessories
818 Tub and Shower Doors/Mirrors
819 Finish Grading
820 Pool/Spa
821 Hardscape-Driveway, Walkways, Steps
822 Landscaping
823 Irrigation System
824 Fencing including Gates
825 Touch-up/Final Cleaning
SUB-TOTAL BUILDING COMPLETION
TOTAL “SITE & Hard” COSTS
TOTAL PROJECT COSTS

Hakkında Cumhur Şamiloğlu
Civil Eng., MRICS Management of International Business (MSc-2002)

Bir Cevap Yazın

Aşağıya bilgilerinizi girin veya oturum açmak için bir simgeye tıklayın:

WordPress.com Logosu

WordPress.com hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Twitter resmi

Twitter hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Facebook fotoğrafı

Facebook hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Google+ fotoğrafı

Google+ hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Connecting to %s

%d blogcu bunu beğendi: