Örnek Level-1 WBS

PRE CONSTRUCTION COSTS
101 Arch. Engr., Survey, Energy & Soils Study Fees
102 Design Review/Plan Check Fees
103 Permits-City/County
104 Utility Connection Fees
105 School/Park/Misc. Taxes
106 Project Bonds
1. SUB-TOTAL PRE-CONSTRUCTION COSTS
“SITE” CONSTRUCTION COSTS
201 Temporary Utilities & Facilities
202 Special inspections/testing-Geo-tech Structural
203 Job security
204 Equipment Rental
205 Jobsite Overhead
206 Project Management/Supervision
207 General Contractors office overhead/profit
208 State Sales Tax (where applicable)
210 Builder Contingency
2. SUB-TOTAL GENERAL REQUIREMENTS
SITE PREPARATION COSTS
301 Demolition
302 Clearing/Stakeout
303 Rough Grading/shoring/excavation/fill
304 Site retaining walls/waterproofing/backfill
305 Site drainage
306 Private septic system
307 Domestic water well
308 Pump house & pressure water system
309 Environmental
310 Off-site Improvements
3. SUB-TOTAL SITE PREPARATION
FOUNDATION COMPLETE W/FOUNDATION ENDORSEMENT
401 Embedded Hardware
402 Ground Plumbing
403 Ground Mechanical
404 Ground Electrical
405 Underground Utilities
406 Foundation & Building retaining walls poured
407 Concrete slab poured house/garage
4. SUB-TOTAL FOUNDATION COMPLETE
BUILDING ROUGH-IN COMPLETION
501 structural Masonry
502 Rough Framing Materials
503 Structural Steel
504 Modular or Sectional Mfg. Home
505 Package/Kit Home
506 Mfg.. Trusses/Components
507 Rough framing labor
508 Lightweight concrete interior floors
509 Plumbing Top-out
510 Rough heating, ventilation, air conditioning
511 Rough electrical
512 Fire protection sprinkles
513 Fireplaces incl. Flues
514 Security & Communications pre-wiring
5. SUB-TOTAL BUILDING ROUGH-IN COMPLETION
EXTERIOR WEATHERTIGHT
601 Waterproofing decks, shower pans, Etc.
602 Gutters, Downspouts, Sheet Metal
603 Roof covering
604 Windows
605 Exterior Doors
606 Skylights
607 Glazing
608 Exterior Siding (specify)
609 Exterior Trim
610 Stucco
611 Masonry Veneer
612 Ornamental lron
613 Garage Doors & openers
614 Exterior Painting
6. SUB-TOTAL EXTERIOR WEATHERTIGHT
DRYWALL I FINISH CARPENTRY
701 Insulation
702 Drywall/Plasters
703 Interior stairways
704 Cabinetry
705 Finish Materials/Millwork
706 Interior Doors
707 Finish Hardware
708 Finish Carpentry Labor
7. SUB-TOTAL DRYWALL! FINISH CPNTRY
BUILDING COMPLETION/FINAL INSPECTION I N.O.C. FILED
801 Countertops
802 Tub/shower enclosures
803 Interior Painting/Wall coverings
804 Hard surface Finish flooring
805 Carpeting
806 Built-in appliances
807 Special Equipment (specify)
808 Security System
809 Intercom
810 Built-in vacuum cleaner
811 Finish Plumbing
812  Plumbing Fixtures
813 Finish Electrical
814 Electrical Fixtures
815 Finish Heating, ventilation, air conditioning
816 Solar Backup
817 Bath accessories
818 Tub and shower doors/mirrors
819 Finish Grading
820 Pool/Spa
821 Hardscape — Driveway, walkways, steps
822 Landscaping
823 Irrigation system
824 Fencing including gates
825 Touch-up/Final cleaning

Hakkında Cumhur Şamiloğlu
Civil Eng., MRICS Management of International Business (MSc-2002)

Bir Cevap Yazın

Aşağıya bilgilerinizi girin veya oturum açmak için bir simgeye tıklayın:

WordPress.com Logosu

WordPress.com hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Twitter resmi

Twitter hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Facebook fotoğrafı

Facebook hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Google+ fotoğrafı

Google+ hesabınızı kullanarak yorum yapıyorsunuz. Log Out / Değiştir )

Connecting to %s

%d blogcu bunu beğendi: